{"id":14835,"date":"2023-05-03T10:00:33","date_gmt":"2023-05-03T15:00:33","guid":{"rendered":"https:\/\/iowahighwayends.net\/blog\/?p=14835"},"modified":"2023-05-01T00:51:39","modified_gmt":"2023-05-01T05:51:39","slug":"peyton-manning-call-your-office","status":"publish","type":"post","link":"http:\/\/iowahighwayends.net\/blog\/2023\/05\/peyton-manning-call-your-office\/","title":{"rendered":"Peyton Manning, call your office"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-14836\" src=\"http:\/\/iowahighwayends.net\/blog\/wp-content\/uploads\/2023\/04\/omahaoverlays.png\" alt=\"\" width=\"290\" height=\"330\" srcset=\"http:\/\/iowahighwayends.net\/blog\/wp-content\/uploads\/2023\/04\/omahaoverlays.png 290w, http:\/\/iowahighwayends.net\/blog\/wp-content\/uploads\/2023\/04\/omahaoverlays-264x300.png 264w\" sizes=\"auto, (max-width: 290px) 100vw, 290px\" \/><\/p>\n<p>The above image comes from an Iowa DOT sign letting contract that is to be let May 16. The contract covers sign trusses and BGS replacement at four key interchanges: Both ends of I-880 and <a href=\"https:\/\/iowahighwayends.net\/ends\/ia192.html\">IA 29 at old IA 192<\/a>, plus IA 191 at I-880.<\/p>\n<p>Many of the BGSs are getting a complete replacement. This will eliminate the overlaid I-880 shields over the I-680 shields, and also remove the hole for IA 192 on SB I-29 at Exit 57.<\/p>\n<p>Some smaller signs, though, including the relevant ones at <a href=\"https:\/\/iowahighwayends.net\/ends\/ia191.html\">IA 191<\/a>, are getting a greenout overlay. The designation of &#8220;Omaha&#8221; will replace &#8220;North Omaha&#8221;. That name has been used since the signs were originally put up, or in the case of the exit near Shelby, after an extension of I-680 replaced I-80N. This project does <em>not<\/em> include the signs at the Logan\/Beebeetown exit or on westbound I-880 at I-29, so &#8220;North Omaha&#8221; isn&#8217;t completely gone yet.<\/p>\n<p>(I still disagree with the redesignation of part of I-680. Bleah.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The above image comes from an Iowa DOT sign letting contract that is to be let May 16. The contract covers sign trusses and BGS replacement at four key interchanges: Both ends of I-880 and IA 29 at old IA &hellip; <a href=\"http:\/\/iowahighwayends.net\/blog\/2023\/05\/peyton-manning-call-your-office\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[8],"tags":[],"class_list":["post-14835","post","type-post","status-publish","format-standard","hentry","category-construction"],"_links":{"self":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/14835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/comments?post=14835"}],"version-history":[{"count":1,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/14835\/revisions"}],"predecessor-version":[{"id":14837,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/14835\/revisions\/14837"}],"wp:attachment":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/media?parent=14835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/categories?post=14835"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/tags?post=14835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}