{"id":16371,"date":"2026-08-04T10:00:49","date_gmt":"2026-08-04T15:00:49","guid":{"rendered":"https:\/\/iowahighwayends.net\/blog\/?p=16371"},"modified":"2026-08-03T23:48:21","modified_gmt":"2026-08-04T04:48:21","slug":"final-design-set-for-merrill-rail-crossing","status":"publish","type":"post","link":"http:\/\/iowahighwayends.net\/blog\/2026\/08\/final-design-set-for-merrill-rail-crossing\/","title":{"rendered":"Final design set for Merrill rail crossing"},"content":{"rendered":"<p>Waiting for a train on US 75 in Merrill is an experience one wants to have as little as possible. I endured it once last year. Now it&#8217;s going to be fixed.<\/p>\n<p>The Iowa DOT has settled on a design that will <a href=\"https:\/\/iowadot.gov\/modes-travel\/rail\/highway-railroad-crossings\/merrill-rail-crossing-elimination\">relocate US 75 slightly to the east<\/a>, with a bridge over new, slightly straightened railroad tracks. The second public meeting in four months on the subject will be held Aug. 7 in Merrill. While that may sound fast, in the overall six-step process, this is only the latter portion of Step 2. There hasn&#8217;t even been an environmental impact study yet.<\/p>\n<p>This project is not in the five-year plan; reconstruction of 75 through Hinton is, in 2029. That means that without a big change in priorities or a big grant, the earliest construction could begin is late 2031 (fiscal 2032). Once the bridge is open, the railroad tracks can be relocated.<\/p>\n<p>The concept mentions &#8220;reduced-conflict intersection&#8221; for this location. That&#8217;s not really true. What it really is, is a partial interchange at US 75 and old 75 (northbound exit, southbound entrance), with a turnaround for the other two traffic movements just to the south. Right now the south end is a Y intersection.<\/p>\n<p>Also, in a surprise found a while back, the official city map of Merrill shows that old 75, 3rd and Main streets, is secret IA 470. We don&#8217;t know when or why this designation occurred.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Waiting for a train on US 75 in Merrill is an experience one wants to have as little as possible. I endured it once last year. Now it&#8217;s going to be fixed. The Iowa DOT has settled on a design &hellip; <a href=\"http:\/\/iowahighwayends.net\/blog\/2026\/08\/final-design-set-for-merrill-rail-crossing\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[8],"tags":[],"class_list":["post-16371","post","type-post","status-publish","format-standard","hentry","category-construction"],"_links":{"self":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/16371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/comments?post=16371"}],"version-history":[{"count":1,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/16371\/revisions"}],"predecessor-version":[{"id":16372,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/16371\/revisions\/16372"}],"wp:attachment":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/media?parent=16371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/categories?post=16371"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/tags?post=16371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}