{"id":5296,"date":"2014-09-11T10:00:57","date_gmt":"2014-09-11T15:00:57","guid":{"rendered":"http:\/\/iowahighwayends.net\/blog\/?p=5296"},"modified":"2014-09-10T00:54:45","modified_gmt":"2014-09-10T05:54:45","slug":"still-waiting-on-us-20","status":"publish","type":"post","link":"http:\/\/iowahighwayends.net\/blog\/2014\/09\/still-waiting-on-us-20\/","title":{"rendered":"Still waiting on US 20"},"content":{"rendered":"<p>&#8220;We were promised that the whole four-lane corridor would be completed by 2018. That&#8217;s not going to happen,&#8221; <a href=\"http:\/\/www.ktiv.com\/story\/26462374\/2014\/09\/05\/fighting-for-funding-to-finish-highway-20\">Shirley Phillips told KTIV.<\/a><\/p>\n<p>The Moville-to-Correctionville segment will become four lanes in the near future, but there is nothing else scheduled in the five-year plan.<\/p>\n<p><script type='text\/javascript' src='http:\/\/KTIV.images.worldnow.com\/interface\/js\/WNVideo.js?rnd=509591;hostDomain=www.ktiv.com;playerWidth=630;playerHeight=385;isShowIcon=true;clipId=10555591;flvUri=;partnerclipid=;adTag=News;advertisingZone=;enableAds=true;landingPage=;islandingPageoverride=false;playerType=STANDARD_EMBEDDEDscript;controlsType=fixed'><\/script><a href=\"http:\/\/www.ktiv.com\" title=\"KTIV News 4 Sioux City IA:  News, Weather and Sports\">KTIV News 4 Sioux City IA:  News, Weather and Sports<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;We were promised that the whole four-lane corridor would be completed by 2018. That&#8217;s not going to happen,&#8221; Shirley Phillips told KTIV. The Moville-to-Correctionville segment will become four lanes in the near future, but there is nothing else scheduled in &hellip; <a href=\"http:\/\/iowahighwayends.net\/blog\/2014\/09\/still-waiting-on-us-20\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[13],"tags":[],"class_list":["post-5296","post","type-post","status-publish","format-standard","hentry","category-highway-miscellaneous"],"_links":{"self":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/5296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/comments?post=5296"}],"version-history":[{"count":1,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/5296\/revisions"}],"predecessor-version":[{"id":5297,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/posts\/5296\/revisions\/5297"}],"wp:attachment":[{"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/media?parent=5296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/categories?post=5296"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/iowahighwayends.net\/blog\/wp-json\/wp\/v2\/tags?post=5296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}