The DOT has a meeting scheduled for a “corridor preservation plan” at the I-35 interchange with IA 175 at Ellsworth.
The map (PDF) shows that there is a very specific corridor to preserve — four of them, actually, one in each quadrant. That’s a diamond interchange ready to go. The original folded-diamond construction is from the railroad tracks that used to parallel IA 175 on the north side.