Category Archives: Construction

Jul 13

New Janesville exit enters stage 2 of 7

September 28, 2025: Traffic moves on southbound US 218 at the intersection of 260th Street, with Easton Avenue behind the camera. On Monday, traffic switches to head-to-head in the existing northbound lanes (foreground). The position of this picture, once construction … Continue reading

Posted in Construction | Comments Off on New Janesville exit enters stage 2 of 7
Jul 06

Or until the president determines there is no longer an energy crisis

Legislation lowering the state’s speed limit to 55 miles an hour cleared its final legislative hurdle today and was sent to Gov. Robert D. Ray for his signature. … The bill will remain in effect until July 1, 1975, or … Continue reading

Posted in Construction | Comments Off on Or until the president determines there is no longer an energy crisis
Jun 30

Notes on 2027-31 five-year plan

I finally got around to doing a rundown of the big-budget and other interesting items in the 2027-31 Iowa DOT five-year highway plan. Keep in mind that “underfunded” means the DOT hasn’t allocated all the money the project needs, not … Continue reading

Posted in Construction | Comments Off on Notes on 2027-31 five-year plan
Jun 25

J-turns to be placed on US 75 in Plymouth County

Now we know what the grade-and-pave listing for two intersections on US 75 north of Sioux City in the five-year construction plan is for. The intersections of US 75 with county roads C70 and C80, in Plymouth County, just across … Continue reading

Posted in Construction | Comments Off on J-turns to be placed on US 75 in Plymouth County
Jun 19

State Center NOT getting J-turn intersection

For at least the third time, the Iowa DOT’s attempt to turn a major intersection into a “J-turn” has been met with vocal displeasure from local residents. In March, KCCI reported that the plans to put a J-turn on US … Continue reading

Posted in Construction | Comments Off on State Center NOT getting J-turn intersection
Jun 15

DOT turning Huxley intersection into roundabout

The Iowa DOT intends to convert the four-way stop of highways 69 and 210 south of Huxley into a roundabout in 2028. The informational meeting is scheduled for Thursday evening at Huxley City Hall. This intersection is a mile and … Continue reading

Posted in Construction | Comments Off on DOT turning Huxley intersection into roundabout
Jun 04

Long detour for one ramp in Sioux City

The ramp from westbound US 20/southbound US 75 to southbound I-29 closed Tuesday for an estimated two months, KTIV reports. It’s for a bridge deck overlay and barrier replacement. The Iowa DOT’s signed detour takes travelers north on I-29 all … Continue reading

Posted in Construction | Comments Off on Long detour for one ramp in Sioux City
May 18

IA 21 to close south of Belle Plaine in 2028

For the summer of 2026, US 30 between US 63 and IA 21 is serving as a detour route for US 63. Two summers from now, it will flip to being a detour route for IA 21. A meeting in … Continue reading

Posted in Construction | Comments Off on IA 21 to close south of Belle Plaine in 2028
May 14

Perry roundabout plan reveals messed-up street map

The DOT at its May meeting approved a batch of RISE grants. These “Revitalize Iowa’s Sound Economy” awards are for construction that isn’t necessarily on roads on Iowa’s highway system, but will contribute to economic development. One of the grants … Continue reading

Posted in Construction | Comments Off on Perry roundabout plan reveals messed-up street map
May 08

US 34 construction creates long official detour

Officially, US 34 between Chariton and Albia has been closed to thru traffic since April 27 for a concrete overlay. The construction is from Albia west to near the Melrose corner. The detour runs up IA 14 to Knoxville, then … Continue reading

Posted in Construction | Comments Off on US 34 construction creates long official detour