IA 100 ceremony coverage

I admit, I wasn’t there, but with the weather the way it was I can’t say I’m too disappointed in missing out.

KCRG has a story about the IA 100 ribbon cutting and ceremonial ride/walk along the new segment. The end of the story says the DOT won’t open the road to traffic until “later this winter” and signs were not on US 30 as of last week.

This entry was posted in Construction. Bookmark the permalink.