Category Archives: Construction

Nov 20

Ottumwa Business 63 reconstruction modifies quasi-interchange

April 13, 2016: This view of the connection from Second Street to IA 149 shows a two-ramp set. The ramp from 149 to Second, where the bicyclist is, would be removed under a proposed plan. On the Iowa DOT’s information … Continue reading

Posted in Construction | Comments Off on Ottumwa Business 63 reconstruction modifies quasi-interchange
Nov 05

R70 exit open between Ames and Nevada

The US 30 exit at County Road R70 opened Oct. 14, according to a press release from the DOT. The overpass bridge was built right next to the intersection, so there’s going to be a slight bend in R70 from … Continue reading

Posted in Construction | Comments Off on R70 exit open between Ames and Nevada
Oct 18

US 30 four-lane link open

In the past month, I have driven back and forth on US 30 in Benton County repeatedly. Each time, I approached the Luzerne corner (County Road V44) or IA 21 wondering if this was the time that the last barriers … Continue reading

Posted in Construction | Comments Off on US 30 four-lane link open
Oct 07

US 30 four-lane in Benton so, so almost close to finished

For a variety of reasons, I’ve been going back and forth on US 30 in Benton County the past couple of weeks. This summer, crews have been working on the last part of the four-lane, from the Luzerne corner (V44) … Continue reading

Posted in Construction | Comments Off on US 30 four-lane in Benton so, so almost close to finished
Sep 30

Wapello bypass at meeting stage again (now with 100% more exits!)

Tuesday night is going to have a rarity for highway construction plans nowadays, a formal meeting. An “updated preliminary design” for the US 61 Wapello bypass comes six years after the initial proposal. It includes a huge change. The new … Continue reading

Posted in Construction | Comments Off on Wapello bypass at meeting stage again (now with 100% more exits!)
Sep 16

Janesville’s north connection to 218 changing

Starting today, according to an Iowa DOT press release, the intersection of US 218 and Maple Street on the north side of Janesville will be closed. A new road will be built alongside the railroad tracks heading north to a … Continue reading

Posted in Construction | Comments Off on Janesville’s north connection to 218 changing
Aug 29

Stop hitting bridges!

The Iowa Department of Transportation is having a special September letting. Contracts are accelerated rather than waiting until the normal date later in the month. Four of the lettings are in Bremer, Polk, Scott, and Story counties. All of them … Continue reading

Posted in Construction | Comments Off on Stop hitting bridges!
Aug 21

Hess Road-La Porte Road under construction

A construction project on Hess Road and La Porte Road on the south side of Waterloo started last week. The plan dates back to 2020 (large slideshow PDF here). It starts with a new roundabout at Hess and Shaulis roads and … Continue reading

Posted in Construction | Comments Off on Hess Road-La Porte Road under construction
Aug 06

Lane additions on US 63 planned for 2026

Last month the Iowa DOT held a meeting in Tama about turning US 63 into a Super-2 highway. Two large PDFs are online. The project is scheduled for 2026. Traffic will be detoured onto IA 8 and IA 21 and … Continue reading

Posted in Construction | Comments Off on Lane additions on US 63 planned for 2026
Jul 05

Breakdown of 2025-29 highway plan

My annual breakdown of the big stuff planned for construction in the Iowa DOT’s five-year plan is on Substack.

Posted in Construction | Comments Off on Breakdown of 2025-29 highway plan