Category Archives: Construction

Feb 21

West Branch six-laning in two parts

Expansion of I-80 to six lanes from the present end of that section in Iowa City to just east of the West Branch exit is on the DOT’s five-year plan. Based on a construction letting, I think it’s being broken … Continue reading

Posted in Construction | Comments Off on West Branch six-laning in two parts
Jan 21

I-80 Iowa County rest area expansion plan

The Iowa DOT’s plan to expand parking at the I-80 eastbound rest area between the Victor and Ladora exits is available online. Construction is planned for late next year. KCCI reported that a rebuilt westbound rest area opened just before Christmas, … Continue reading

Posted in Construction | Comments Off on I-80 Iowa County rest area expansion plan
Jan 12

Waverly-Janesville road will be upgraded

The 1914 map above shows the Red Ball Route north of Janesville shifting to the section line, once the railroad gets out of the way, in the southwest corner of Section 23. This kink, approximately 1/8 mile, was turned into … Continue reading

Posted in Construction | Comments Off on Waverly-Janesville road will be upgraded
Dec 10

IA 175 bridge detour in off-season

Earlier this week, IA 175 west of Mapleton closed for a bridge replacement. This complete shutdown over winter is unusual for Iowa construction. US 20 in western Iowa was going to be detoured through Galva and Schaller over both the … Continue reading

Posted in Construction | Comments Off on IA 175 bridge detour in off-season
Dec 03

New I-74 bridge fully open; old fully closed

Thousands of people turned out for the grand opening of the I-74 bridge on Wednesday. (I, sadly, was not one of them.) The Illinois-bound span fully opened Thursday night, and the last lane in use on the 1959 bridge was … Continue reading

Posted in Construction, Highway Miscellaneous | Comments Off on New I-74 bridge fully open; old fully closed
Nov 24

I-74 bridge walk precedes final opening

June 19, 2021: Construction cranes tower over the “basket handles” of the new I-74 bridge over the Mississippi River, as seen from the Bettendorf side. The last expected completion date of the Illinois-bound (southbound/eastbound) span of the I-74 bridge was … Continue reading

Posted in Construction | Comments Off on I-74 bridge walk precedes final opening
Nov 19

More roundabouts to be inflicted on Cedar Falls drivers

Recently, Cedar Falls wrapped up a massive project to annoy anyone who’s still interested in shopping at College Square by placing FIVE roundabouts on University Avenue. (Technically, it’s three roundabouts plus two almost-roundabouts at the IA 58 on-ramps, but they’re … Continue reading

Posted in Construction | Comments Off on More roundabouts to be inflicted on Cedar Falls drivers
Nov 10

Mainline northbound I-29 shutting down at I-480

Next week, for the first time since the interstate system was constructed, there will be a way to get from I-29 to eastbound Broadway in Council Bluffs. It just comes at the expense of everything else, including the interstate itself. … Continue reading

Posted in Construction | Comments Off on Mainline northbound I-29 shutting down at I-480
Oct 13

Auburn intersection becoming all-way stop

The intersection of US 71 and IA 175 on the north side of Auburn will be turned into an all-way stop later this month, the DOT says. At this intersection, northbound 71 turns from northbound to westbound while IA 175 … Continue reading

Posted in Construction | Comments Off on Auburn intersection becoming all-way stop
Oct 11

DOT taking ramps out of Sioux City interchange

June 12, 2005: This “ghost ramp,” built in 1979 and never used, would have been for (future) southbound US 75 to eastbound US 20. Instead, this area will have its existing ramp removed for a stoplight around where the car … Continue reading

Posted in Construction | Comments Off on DOT taking ramps out of Sioux City interchange