-
Recent Posts
Informational PDFs
- 2010 Iowa City Population Descending Order
- 2010 Iowa County Population Descending Order
- 2020 Iowa City Population Descending Order
- 2020 Iowa County Population Descending Order
- Iowa HS FB playoff brackets 2014
- Iowa HS FB playoff brackets 2015
- Iowa HS FB playoff brackets 2018
- School Directions Booklet FINAL
Key Posts
- College conferences and House apportionment
- How Iowa State has lost football games in the 21st century
- Iowa 2010 population breakdown
- Iowa daily newspaper publication, 2022
- Iowa school enrollment changes, 2001-15 (maps)
- Iowa's largest school enrollment gainers, 2001-15
- Kossuth County Area Schools and Rural Iowa's Population Collapse
- Post offices targeted for closure (1)
- Post offices targeted for closure (2)
Roadgeeking
Categories
Category Archives: Construction
Aug
07
It’s hard to get to Collins right now, too
The companion piece to yesterday’s blog post was announced late last week: US 65 is closed at IA 330 for three weeks in order to build the connection to the new interchange bridge. That means that from Aug. 6-16, there … Continue reading
Posted in Construction
Comments Off on It’s hard to get to Collins right now, too
Aug
06
It’s hard to get to Baxter right now
Construction projects at either end of old IA 223 in Jasper County make any east-west excursion to Baxter somewhat difficult at the moment. Baxter is one of a handful of Iowa towns with a population above 1000 but without a … Continue reading
Posted in Construction
Comments Off on It’s hard to get to Baxter right now
Aug
02
I-95, nearly complete at last
A big roadgeeking milestone will happen this year: Interstate 95, and the original layout of the interstate highway system, will become complete. I-95 has been discontinuous between Pennsylvania and New Jersey since the system began. It’s New Jersey’s fault (video). … Continue reading
Posted in Construction
Comments Off on I-95, nearly complete at last
Aug
01
Ames flyover potentially unfinished this year
The maligned I-35 flyover ramp to US 30 at Ames is so messed up it may not open until next year. The Iowa State Daily has the story on the DOT acknowledging the delay. A couple weeks ago news came out that the … Continue reading
Posted in Construction
Comments Off on Ames flyover potentially unfinished this year
Jul
31
Sabula bridge delayed again
The shiny new Mississippi River bridge at Sabula will be lonely for a few more weeks as high waters have delayed construction at the overflow bridge again. The Iowa DOT says it won’t be done in time for Labor Day. … Continue reading
Posted in Construction
Comments Off on Sabula bridge delayed again
Jul
25
Another stoplight for US 69 in Ames
Not a huge development in the scheme of things, but US 69 (South Duff Avenue) is getting its second stoplight south of US 30 in Ames, reports the Ames Tribune. The construction project will three-lane 69 from the first city … Continue reading
Posted in Construction
Comments Off on Another stoplight for US 69 in Ames
Jul
24
US 20 Galva-Early detour over
New Highway 20 took another step forward Friday, when the detour between Galva and Early was lifted. Traffic is now on the new westbound lanes, a construction notice said last week. The video below is from KCAU.
Posted in Construction
Comments Off on US 20 Galva-Early detour over
Jul
23
218 construction detoured through Van Horne
May 16, 2017: The original south end of US 218, at US 30, which has always been the Lincoln Highway here (westbound lanes). The four-lane will be shifted very slightly for the new interchange. Construction on the US 30/218 interchange … Continue reading
Posted in Construction
Comments Off on 218 construction detoured through Van Horne
Jul
16
Ames flyover ramp has to be redone
An engineering miscalculation will mean much longer construction time for the flyover ramp from northbound I-35 to westbound US 30, KCCI reports. (Warning: Not only does the video autoplay, it stops when you scroll down!) The tops of the support … Continue reading
Posted in Construction
Comments Off on Ames flyover ramp has to be redone
Jul
02
Even with grant, historic bridge replacement too expensive
A closed connection in Iowa’s Great River Road looks like it will remain that way, and perhaps permanently. The Iowa DOT offered $1.5 million to the city of Burlington to go to repairs of the Cascade Bridge, but the city … Continue reading
Posted in Construction
Comments Off on Even with grant, historic bridge replacement too expensive