-
Recent Posts
Informational PDFs
- 2010 Iowa City Population Descending Order
- 2010 Iowa County Population Descending Order
- 2020 Iowa City Population Descending Order
- 2020 Iowa County Population Descending Order
- Iowa HS FB playoff brackets 2014
- Iowa HS FB playoff brackets 2015
- Iowa HS FB playoff brackets 2018
- School Directions Booklet FINAL
Key Posts
- College conferences and House apportionment
- How Iowa State has lost football games in the 21st century
- Iowa 2010 population breakdown
- Iowa daily newspaper publication, 2022
- Iowa school enrollment changes, 2001-15 (maps)
- Iowa's largest school enrollment gainers, 2001-15
- Kossuth County Area Schools and Rural Iowa's Population Collapse
- Post offices targeted for closure (1)
- Post offices targeted for closure (2)
Roadgeeking
Categories
Category Archives: Construction
Jun
12
Sabula ferry service offered
Starting today, the Iowa DOT is offering “complimentary vehicular/passenger ferry service” across the Mississippi River from Sabula to Savanna. This would last at least through the summer because of the delays in construction of the overflow bridge. There’s also a … Continue reading
Posted in Construction
Comments Off on Sabula ferry service offered
Jun
06
Current bypass philosophy, 61 corridor interests at odds
As late guests to the state’s bypass party, Mediapolis and Wapello are the beneficiaries of about 25 years of such work — or, depending on your point of view, the victims. The “preferred alternative” for a four-lane US 61 from … Continue reading
Posted in Construction
Comments Off on Current bypass philosophy, 61 corridor interests at odds
May
31
Meeting June 5 on US 30-IA 21 interchange
The project to four-lane US 30 between Tama and US 218 has four components. The upgrade to four lanes in each county are separate pieces, on slightly different timetables. The interchange with US 218 should start any time. The middle … Continue reading
Posted in Construction
Comments Off on Meeting June 5 on US 30-IA 21 interchange
May
22
Wapello bypass plans finalized
Louisa County became the 61st county in the state to have a rural four-lane highway segment when last year’s upgrade to US 61 opened from the Muscatine County line to south of Grandview. Now, as part of the last step … Continue reading
Posted in Construction
Comments Off on Wapello bypass plans finalized
May
15
Notes on 2019-23 DOT program
The DOT released its newest five-year plan (large PDF) last week (stories: Gazette, Register) and the completion of two decade-long projects is in sight. Others have slight tweaks to their schedules or funding is being shifted around a bit in fiscal … Continue reading
Posted in Construction
Comments Off on Notes on 2019-23 DOT program
May
14
Sabula overflow bridge closed longer
Those 3 1/2 months the new US 52 Mississippi River bridge was open are going to have to last a while, because construction nearby is getting worse. KWQC reports that because of drilling issues on replacement of the overflow bridge, … Continue reading
Posted in Construction
Comments Off on Sabula overflow bridge closed longer
May
01
I-74 bridge construction on schedule
KWQC has an update for the beginning of construction season, along with a video that shows piers up and roadbed being laid on the Iowa side. In order for more piers to be put up, the US 67 exit will … Continue reading
Posted in Construction
Comments Off on I-74 bridge construction on schedule
Apr
24
Highway 20. This year. Seriously. We mean it.
June 25, 2006: For more than half a century, the 1½ mile fraction of a four-lane US 20, mostly with US 59, stood alone surrounded by two-lane roads. I put a photo of the other end of this segment with … Continue reading
Posted in Construction
Comments Off on Highway 20. This year. Seriously. We mean it.
Apr
23
Big 80/380 interchange meeting today
September 30, 1970: Initial construction stage of the I-80/I-380/US 218 interchange in Johnson County, via Iowa Geographic Map Server. It was built as a cloverleaf, but US 218 to the south would come after I-380 opened. You know it’s important … Continue reading
Posted in Construction
Comments Off on Big 80/380 interchange meeting today
Apr
12
Two-year project maintains IA 122 one-ways
I’m not quite sure why this isn’t listed on the DOT’s public information page, but this construction season is the first part of a two-year project to rebuild IA 122 in downtown Mason City. The KIMT story has views of … Continue reading
Posted in Construction
Comments Off on Two-year project maintains IA 122 one-ways