Category Archives: Construction

Nov 17

New Sabula bridge opens today

September 27, 2015: My last trip across the Savanna-Sabula Bridge, before any major construction began on its replacement. A ribbon cutting for the new US 52/IA 64 bridge over the Mississippi River, officially known as the Dale Gardner Veterans Memorial Bridge, … Continue reading

Posted in Construction | Comments Off on New Sabula bridge opens today
Nov 16

Two diverging diamond exits proposed for Linn County

The six-lane I-380 through Cedar Rapids begins/ends at the Blairs Ferry Road exit, which is partially integrated into the IA 100 volleyball interchange. However, with growth in Hiawatha, that is not sufficient for the northern part of the metro area. … Continue reading

Posted in Construction | Comments Off on Two diverging diamond exits proposed for Linn County
Nov 07

What’s worse than a roundabout?

Waterloo Courier: CEDAR FALLS – City officials are preparing to begin the third and final phase of the University Avenue project in 2018, which includes a double roundabout at the on- and off-ramps at Iowa Highway 58’s interchange.

Posted in Construction | Comments Off on What’s worse than a roundabout?
Nov 02

‘Bridge Fest – The Last Drive’

September 27, 2015: A boat passes under the US 52/IA 64 Savanna-Sabula bridge. A new bridge has been built immediately downstream (foreground) over the past two years. The easternmost bridge in Iowa had a “closing ceremony” Oct. 21. A parade … Continue reading

Posted in Construction | Comments Off on ‘Bridge Fest – The Last Drive’
Oct 27

Oskaloosa bypass plans finalized

A “preferred alternative” for a northwest Oskaloosa bypass of US 63 has been selected and many preliminary studies have been completed. A meeting Nov. 2 at the Oskaloosa library Middle School, the first in nearly three years, will have information about … Continue reading

Posted in Construction | Comments Off on Oskaloosa bypass plans finalized
Oct 25

HUGE reconstruction of NE Mixmaster in the works

ca. 1960: The Northeast Mixmaster was an integral part of Iowa’s interstate system from the beginning. Photo via Iowa DNR’s Historic Aerial Photo Project because the Iowa Orthographic website wasn’t working (noooo!). The most complex interchange in Iowa is going … Continue reading

Posted in Construction | Comments Off on HUGE reconstruction of NE Mixmaster in the works
Oct 13

Dust off US 30 ROW at US 169

July 5, 2013: West junction of US 30 and US 169 between Ogden and Beaver. There used to be a weigh station to the right. This is 30’s last at-grade intersection with a numbered route until IA 21. In light … Continue reading

Posted in Construction | Comments Off on Dust off US 30 ROW at US 169
Sep 21

Urbana intersection meeting Sept. 26

I thought the decision to turn the curve for IA 150 west of Urbana (the end of old IA 363) into an intersection was a done deal, but I guess I was wrong. There’s going to be a meeting Sept. … Continue reading

Posted in Construction | Comments Off on Urbana intersection meeting Sept. 26
Sep 19

I-35 ramp to EB US 30 closes

March 25, 2010: I-35 at US 30, with one of the few pull-through signs in Iowa. Exit 111A is closed starting today. The exit from from northbound I-35 to eastbound US 30 closed earlier today for a month and a … Continue reading

Posted in Construction | Comments Off on I-35 ramp to EB US 30 closes
Sep 07

Four-way stop coming to Lone Tree corner

October 13, 2006: Eastbound IA 22 at old north end of IA 405. Throughout the 45 years that the intersection of IA 22 and the road leading into Lone Tree was a state highway (IA 405), 22 was always the … Continue reading

Posted in Construction, Highway Miscellaneous | Comments Off on Four-way stop coming to Lone Tree corner