What’s NOT in the highway plan

Plans for four-laning US 63 south of Ottumwa had made it to the design stage, but construction or preparation for construction is not in the new five-year program.

The Ottumwa-to-Kirksville segment will remain two lanes for the foreseeable future.

This entry was posted in Construction. Bookmark the permalink.