Category Archives: Construction

Nov 11

A tiny bit of an O’Hare bypass

This is for Illinois and not Iowa, but it will be notable in the future for interstate drivers. A small portion of I-490, the long-promised west bypass of O’Hare airport, opened a few weeks ago (WMAQ). It is part of … Continue reading →

Posted in Construction | Comments Off on A tiny bit of an O’Hare bypass
Nov 09

Greenhill Road interchange meeting Tuesday

The Iowa DOT will hold a public information meeting about plans for construction of the Greenhill Road interchange on Tuesday in Cedar Falls. This project was marked as underfunded in the Iowa DOT’s five-year plan, but since then, Sen. Chuck Grassley … Continue reading →

Posted in Construction | Comments Off on Greenhill Road interchange meeting Tuesday
Nov 02

Lansing bridge will have ribbon-cutting

The Iowa and Wisconsin DOTs gave a week’s notice about a ceremony for the Lansing bridge on Friday. A “brief ribbon-cutting” is scheduled for 11 AM on the bridge with a “ceremonial first crossing”. “Planned attendees include state, local, and … Continue reading →

Posted in Construction | Comments Off on Lansing bridge will have ribbon-cutting
Oct 26

US 30 Wheatland meeting today

The historical alignments of US 30 in the Wheatland area are going to get another squiggle following a construction project next year. The Iowa DOT is holding a public information meeting this evening at the Wheatland Community Center about new … Continue reading →

Posted in Construction | Comments Off on US 30 Wheatland meeting today
Oct 15

IA 175 Des Moines River bridge replacement will last a year

The Iowa DOT has put up an online-feedback form regarding the replacement of the IA 175 bridge across the Des Moines River. The project will start next summer, the press release says, and presumably that will be after July 1, … Continue reading →

Posted in Construction | Comments Off on IA 175 Des Moines River bridge replacement will last a year
Sep 09

New Lansing bridge to open early

The Black Hawk Bridge’s replacement in Lansing is now expected to open in “early November,” rather than in 2027, according to a press release from the Iowa DOT. The press release uses the phrase “Mississippi River Crossing at Lansing” instead … Continue reading →

Posted in Construction | Comments Off on New Lansing bridge to open early
Aug 04

Final design set for Merrill rail crossing

Waiting for a train on US 75 in Merrill is an experience one wants to have as little as possible. I endured it once last year. Now it’s going to be fixed. The Iowa DOT has settled on a design … Continue reading →

Posted in Construction | Comments Off on Final design set for Merrill rail crossing
Jul 29

US 20/59 intersections to be converted to J-turns

Good news: US 20 will not be getting a roundabout in Holstein! Bad news: Both intersections with US 59 are going to become J-turns! The story from KTIV says that this was selected over the roundabout due to right-of-way issues. … Continue reading →

Posted in Construction | Comments Off on US 20/59 intersections to be converted to J-turns
Jul 13

New Janesville exit enters stage 2 of 7

September 28, 2025: Traffic moves on southbound US 218 at the intersection of 260th Street, with Easton Avenue behind the camera. On Monday, traffic switches to head-to-head in the existing northbound lanes (foreground). The position of this picture, once construction … Continue reading →

Posted in Construction | Comments Off on New Janesville exit enters stage 2 of 7
Jul 06

Or until the president determines there is no longer an energy crisis

Legislation lowering the state’s speed limit to 55 miles an hour cleared its final legislative hurdle today and was sent to Gov. Robert D. Ray for his signature. … The bill will remain in effect until July 1, 1975, or … Continue reading →

Posted in Construction | Comments Off on Or until the president determines there is no longer an energy crisis