Category Archives: Construction

Aug 29

Stop hitting bridges!

The Iowa Department of Transportation is having a special September letting. Contracts are accelerated rather than waiting until the normal date later in the month. Four of the lettings are in Bremer, Polk, Scott, and Story counties. All of them … Continue reading

Posted in Construction | Comments Off on Stop hitting bridges!
Aug 21

Hess Road-La Porte Road under construction

A construction project on Hess Road and La Porte Road on the south side of Waterloo started last week. The plan dates back to 2020 (large slideshow PDF here). It starts with a new roundabout at Hess and Shaulis roads and … Continue reading

Posted in Construction | Comments Off on Hess Road-La Porte Road under construction
Aug 06

Lane additions on US 63 planned for 2026

Last month the Iowa DOT held a meeting in Tama about turning US 63 into a Super-2 highway. Two large PDFs are online. The project is scheduled for 2026. Traffic will be detoured onto IA 8 and IA 21 and … Continue reading

Posted in Construction | Comments Off on Lane additions on US 63 planned for 2026
Jul 05

Breakdown of 2025-29 highway plan

My annual breakdown of the big stuff planned for construction in the Iowa DOT’s five-year plan is on Substack.

Posted in Construction | Comments Off on Breakdown of 2025-29 highway plan
Jun 05

Des Moines’ Grand-Fleur intersection undergoing big change

The intersection of Fleur Drive (originally SW 21st Street) and Grand Avenue on the west side of downtown Des Moines had a history in the state highway system. Fleur was the main way for downtown traffic to get to the … Continue reading

Posted in Construction | Comments Off on Des Moines’ Grand-Fleur intersection undergoing big change
Jun 03

Springville interchange still four years out

It has been more than a decade since the US 151-X20 intersection at Springville gained notoriety as a crash-prone spot. It’s been five years since upgraded warning signs were placed there. A long-proposed interchange will not be built for another … Continue reading

Posted in Construction | Comments Off on Springville interchange still four years out
May 08

Greenhill Road exit plan a roundabout mess

There are two intersections left on IA 27/58 between US 20 and US 218. As with Viking Road (a SPUI), the Iowa DOT wants to convert the Greenhill Road intersection into an interchange. Once again (AAAARRRRGGGHHHH), the presentation is a … Continue reading

Posted in Construction | Comments Off on Greenhill Road exit plan a roundabout mess
Apr 29

US 218 detoured through Garrison for month

Part of US 218 in Benton County will be closed for a culvert replacement for the next month, a press release from the Iowa DOT says. The highway through Vinton will be closed to through traffic and detoured on E22 … Continue reading

Posted in Construction | Comments Off on US 218 detoured through Garrison for month
Apr 18

Is ‘no’ acceptable input?

“The Iowa Department of Transportation is requesting your input on a for a proposed roundabout at the intersection of Iowa 3 and Iowa 143 near Marcus in Cherokee county,” says the press release, incorrectly not capitalizing “County” at the end. … Continue reading

Posted in Construction | Comments Off on Is ‘no’ acceptable input?
Apr 12

CR gets money to replace 8th Avenue Bridge

Three years ago, when I wrote about Cedar Rapids wanting to replace the Eighth Avenue bridge, I cited a 2019 Gazette story that mentioned an estimated cost of around $30 million for the bridge and $50 million overall. Last week, … Continue reading

Posted in Construction | Comments Off on CR gets money to replace 8th Avenue Bridge