Category Archives: Construction

Jul 28

More stories on upcoming Black Hawk Bridge closure

There’s still no firm date for the closure of the Black Hawk Bridge over the Mississippi River in Lansing, but we have another clue. The PBS Wisconsin show “Here & Now” has a 4-minute story about the closure and says … Continue reading →

Posted in Construction | Comments Off on More stories on upcoming Black Hawk Bridge closure
Jul 17

Turn, turn, turn

May 30, 2003: The standard right-turn lane to Atkins is no longer sufficient for traffic needs. From the category of “construction projects that should have happened a decade ago but didn’t,” there are two little ones that could provide big … Continue reading →

Posted in Construction | Comments Off on Turn, turn, turn
Jul 11

Entire Boyson Road interchange to close for 20 days

KCRG reports that Boyson Road at I-380 will be closed for weeks starting Monday. There does not appear to be a corresponding press release on the Iowa DOT’s site. KCRG says it’s for “20 working days” so that’ll be four weeks. … Continue reading →

Posted in Construction | Comments Off on Entire Boyson Road interchange to close for 20 days
Jul 08

Key Lincoln Highway point in Cedar Rapids opens as roundabout

As of last Thursday, based on a press release from the city of Cedar Rapids, a devil’s circle roundabout has opened downtown at Mount Vernon Road SE/10th Street SE/8th Avenue SW. This intersection is where the “cutoff” for the Lincoln … Continue reading →

Posted in Construction | Comments Off on Key Lincoln Highway point in Cedar Rapids opens as roundabout
Jul 03

US 30 changing in Grand Island area

In 2016, construction prevented me from clinching US 30 in Nebraska. Then, in 2023, a new four-lane 30 opened from the north side of Fremont to Columbus. (Contrary to expectations in my blog post, a truck relief route in Blair … Continue reading →

Posted in Construction | Comments Off on US 30 changing in Grand Island area
Jun 17

Clinton construction project takes out 1931 concrete

In 2019, a construction project on the west side of Clinton sealed off an old routing of US 30 that retained original concrete. Now another project in the same area is obliterating historic concrete altogether. Reconstruction of Manufacturing Drive started … Continue reading →

Posted in Construction | Comments Off on Clinton construction project takes out 1931 concrete
Jun 13

Black Hawk bridge reopens

The IA 9/WI 82 Black Hawk Bridge across the Mississippi River at Lansing reopened Monday after being closed since May 17. The Iowa DOT said in its press release that another long-term closure is expected this summer and the water … Continue reading →

Posted in Construction | Comments Off on Black Hawk bridge reopens
Jun 11

Big US 30/US 169 closure in Boone County

The interesting part of the DOT press release about the closure of US 30 west of Ogden starting Monday is that it mentions a concrete overlay project instead of the usual asphalt overlay. But if you live anywhere in the area, … Continue reading →

Posted in Construction | Comments Off on Big US 30/US 169 closure in Boone County
Jun 05

IA 136 bridge to close for months

Starting Monday, the IA 136 bridge over the Mississippi River will be closed until November. The Iowa DOT just says “repairs” in the press release and uses Google Maps to show the detour. KROS Radio in Clinton says it’s for … Continue reading →

Posted in Construction | Comments Off on IA 136 bridge to close for months
May 23

Lansing bridge closed until further notice

The IA 9/WI 82 bridge at Lansing has been closed again. The bridge was closed starting May 17 after one of the existing bridge’s piers moved. This isn’t the first time this has happened during construction of the bridge’s replacement … Continue reading →

Posted in Construction | Comments Off on Lansing bridge closed until further notice