Grand Avenue bridge reopens

Closed nine months for construction, the bridge just east of 1st/63rd Street is finally open less than two weeks before Christmas. Three of the planned five four lanes will be open. (Des Moines Register)

This post has been edited.
This entry was posted in Construction. Bookmark the permalink.