Category Archives: Construction

Jun 10

Seippel Road exit has opened

Close to a month late but: The Dubuque Telegraph Herald and KDTH Radio both reported that the US 20 Seippel Road exit, which will also be the the west end of the Southwest Arterial, opened May 19. I have seen … Continue reading

Posted in Construction | Comments Off on Seippel Road exit has opened
May 29

Notes on 2021-25 highway plan

The Iowa Transportation Commission released its draft 2021-25 five-year construction plan at its meeting earlier this month. I guess I can’t really call it in analysis if I’m just condensing the existing information? Anyway, here are current estimated completions (in … Continue reading

Posted in Construction | Comments Off on Notes on 2021-25 highway plan
May 27

IA 14 to be detoured through Beaman

IA 14 will be closed between IA 96 and IA 175 this summer for a concrete overlay project starting next week, a press release from the DOT says. The official detour uses T29 between 96 and 14. The work technically … Continue reading

Posted in Construction | Comments Off on IA 14 to be detoured through Beaman
May 22

Part of original Fort Madison found

December 18, 2006: Based on archaeological evidence found in 2020, this photo’s position is practically on top of a War of 1812-era fort. IA 2’s east end was moved west after the opening of the US 61 bypass. About a … Continue reading

Posted in Construction | Comments Off on Part of original Fort Madison found
May 07

IA 144 to be three-laned in Perry

December 12, 2005: South end of IA 144 on the south side of Perry. According to a story this week from the Perry Chief, Perry is spending $1 million to resurface 60 blocks in town. The last sentence adds another … Continue reading

Posted in Construction | Comments Off on IA 144 to be three-laned in Perry
Apr 24

I-80 Mississippi River bridge project initiated

October 13, 2006: I-80 heading into Illinois, as seen on the I-80 stateline page. Comparatively, I-80 at the Indiana state line is five lanes each way.  After the I-74 bridge is complete in the Quad Cities, the Iowa and Illinois DOTs … Continue reading

Posted in Construction | Comments Off on I-80 Mississippi River bridge project initiated
Apr 13

Wapello connection debate solved?

I guess ramming your head into a brick wall/plain old obstreperousness sometimes DOES work. The Iowa DOT is prepared to allow an intersection with future four-lane US 61 and a side road south of Wapello, the Muscatine Journal reported nearly two … Continue reading

Posted in Construction | Comments Off on Wapello connection debate solved?
Apr 10

Last Sioux City I-29 project begins

The Iowa DOT says it started repairing a fire-damaged bridge on I-29 this week. The project will last about two months. This unexpected repair issue prevented I-29 from being open to six lanes throughout the city and “completing” the decade-long reconstruction … Continue reading

Posted in Construction | Comments Off on Last Sioux City I-29 project begins
Mar 27

US 30 bridge to be built, then moved into place

To reduce the time US 30 will be closed northeast of Woodbine for a bridge replacement, a different tactic is going to be tried. The new bridge will be built beside the existing one, then slid into place. This will … Continue reading

Posted in Construction | Comments Off on US 30 bridge to be built, then moved into place
Mar 09

US 151 Fairfax construction starts today

Construction season is getting an early start this year, as US 151 is closed through Fairfax starting today. An article from KHAK radio says the closure is related to the railroad bridge. This is, in turn, related to a planned … Continue reading

Posted in Construction | Comments Off on US 151 Fairfax construction starts today